HPSEBL Projection of Power Purcahse Fixed & Variable Cost per unit rate at HP periphery for September,2020

(As on 11.09.2020)

Sr.No. Power Station Name Total Installed Capacity (MW) Capacity Allocated (MW) Fixed Cost (Rs./kWh) Variable Cost (Rs./kWh) Total Cost (Rs./kWh)
1 Anta (Gas) 419.33 15.01 0.73 2.62 3.35
2 Anta (Liquid) 0.73 13.11 13.83
3 Anta (LNG) 0.73 5.84 6.57
4 Auraiya (Gas) 663.36 22.02 0.65 2.72 3.37
5 Auraiya (Liquid) 0.65 14.06 14.71
6 Auraiya (LNG) 0.65 5.98 6.63
7 Dadri (Gas) 829.78 24.98 0.59 2.51 3.10
8 Dadri (Liquid) 0.59 12.56 13.15
9 Dadri (LNG) 0.59 5.62 6.21
10 Dadri II (Thermal) 980.00 1.96 1.46 3.52 4.98
11 Kahalgaon -II STPS 1500.00 22.95 1.11 2.08 3.19
12 Rihand-I STPS 1000.00 36.80 0.88 1.53 2.41
13 Rihand-II STPS 1000.00 34.90 0.73 1.53 2.26
14 Rihand-III STPS 1000.00 35.81 1.50 1.51 3.01
15 Singrauli STPS 2000.00 3.60 0.68 1.45 2.13
16 Unchahar-I TPS 420.00 7.31 1.11 3.21 4.32
17 Unchahar-II TPS 420.00 12.89 1.04 3.24 4.28
18 Unchahar-III TPS 210.00 8.44 1.38 3.21 4.60
19 Unchahar-IV TPS 500.00 1.05 1.60 3.03 4.64
20 Tanda-II 660 0.99 1.71 2.71 4.42