HPSEBL Projection of Power Purcahse Fixed & Variable Cost per unit rate at HP periphery for September, 2021

(As on 09.09.2021)

Sr.No. Power Station Name Owner Total Installed Capacity (MW) Capacity Allocated (MW) Fixed Cost (Rs./kWh) Variable Cost (Rs./kWh) Total Cost (Rs./kWh)
1 Anta (Gas) Central ISGS 419.33 15.01 0.73 0.00 0.73
2 Anta (Liquid) 0.73 13.19 13.93
3 Anta (LNG) 0.73 10.21 10.94
4 Auraiya (Gas) 663.36 22.02 0.66 0.00 0.66
5 Auraiya (Liquid) 0.66 13.03 13.69
6 Auraiya (LNG) 0.66 10.16 10.82
7 Dadri (Gas) 829.78 24.98 0.60 2.12 2.72
8 Dadri (Liquid) 0.60 16.78 17.37
9 Dadri (LNG) 0.60 9.38 9.98
10 Dadri II (Thermal) 980.00 1.96 1.49 3.12 4.60
11 Kahalgaon -II STPS 1,500.00 22.95 1.13 2.64 3.76
12 Rihand-I STPS 1,000.00 36.80 0.87 1.50 2.37
13 Rihand-II STPS 1,000.00 34.90 0.73 1.49 2.22
14 Rihand-III STPS 1,000.00 35.81 1.49 1.47 2.97
15 Unchahar-I TPS 420.00 7.31 1.12 3.46 4.58
16 Unchahar-II TPS 420.00 12.89 1.04 3.49 4.53
17 Unchahar-III TPS 210.00 8.44 1.39 3.46 4.85
18 Uri HEP 480.00 13.01 0.85 0.85 1.70
19 Unchahar-IV TPS State Generation 500.00 1.05 1.61 3.26 4.87
20 Tanda-II 660.00 0.99 1.72 2.79 4.51