HPSEBL Projection of Power Purcahse Fixed & Variable Cost per unit rate at HP periphery for February,2021

(As on 10.02.2021)

Sr.No. Power Station Name Owner Total Installed Capacity (MW) Capacity Allocated (MW) Fixed Cost (Rs./kWh) Variable Cost (Rs./kWh) Total Cost (Rs./kWh)
1 Anta (Gas) Central ISGS 419.33 15.01 0.74 2.09 2.83
2 Anta (Liquid) Central ISGS 0.74 13.26 14.00
3 Anta (LNG) Central ISGS 0.74 0.00 0.74
4 Auraiya (Gas) Central ISGS 663.36 22.02 0.66 2.16 2.82
5 Auraiya (Liquid) Central ISGS 0.66 13.03 13.69
6 Auraiya (LNG) Central ISGS 0.66 11.14 11.80
7 Dadri (Gas) Central ISGS 829.78 24.98 0.60 2.11 2.71
8 Dadri (Liquid) Central ISGS 0.60 12.94 13.54
9 Dadri (LNG) Central ISGS 0.60 6.33 6.93
10 Dadri II (Thermal) Central ISGS 980.00 1.96 1.49 3.08 4.57
11 Kahalgaon -II STPS Central ISGS 1500.00 22.95 1.13 2.19 3.32
12 Rihand-I STPS Central ISGS 1000.00 36.80 0.88 1.42 2.30
13 Rihand-II STPS Central ISGS 1000.00 34.90 0.73 1.42 2.15
14 Rihand-III STPS Central ISGS 1000.00 35.81 1.50 1.40 2.90
15 Singrauli STPS Central ISGS 2000.00 3.60 0.68 1.46 2.14
16 Unchahar-I TPS Central ISGS 420.00 7.31 1.12 2.99 4.11
17 Unchahar-II TPS Central ISGS 420.00 12.89 1.05 3.01 4.06
18 Unchahar-III TPS Central ISGS 210.00 8.44 1.40 2.99 4.39
19 Unchahar-IV TPS State Generation 500.00 1.05 1.62 2.82 4.44
20 Tanda-II State Generation 660 0.99 1.74 2.71 4.45