Sr.No. Power Station Name Owner Total Installed Capacity (MW) Capacity Allocated (MW) Fixed Cost (Rs./kWh) Variable Cost (Rs./kWh) Total Cost (Rs./kWh)
1 Anta (Gas) Central ISGS 419.33 0.00 0.00 0.00 0.00
2 Anta (Liquid) 0.00 0.00 0.00
3 Anta (LNG) 0.00 0.00 0.00
4 Auraiya (Gas) 663.36 0.00 0.00 0.00 0.00
5 Auraiya (Liquid) 0.00 0.00 0.00
6 Auraiya (LNG) 0.00 0.00 0.00
7 Dadri (Gas) 829.78 0.00 0.00 0.00 0.00
8 Dadri (Liquid) 0.00 0.00 0.00
9 Dadri (LNG) 0.00 0.00 0.00
10 Dadri II (Thermal) 980.00 1.76 1.27 5.68 6.95
11 Kahalgaon -II STPS 1,500.00 22.95 0.96 2.85 3.81
12 Rihand-I STPS 1,000.00 36.70 0.86 1.64 2.50
13 Rihand-II STPS 1,000.00 34.80 0.81 1.64 2.45
14 Rihand-III STPS 1,000.00 35.71 1.53 1.62 3.15
15 Unchahar-I TPS 420.00 0.25 1.08 4.37 5.45
16 Unchahar-II TPS 420.00 12.85 1.16 3.85 5.01
17 Unchahar-III TPS 210.00 8.40 1.25 4.31 5.56
18 Uri HEP 480.00 13.01 0.99 0.99 1.98
19 Unchahar-IV TPS 500.00 1.00 1.72 4.14 5.86
20 Tanda-II 1,320.00 1.85 1.57 3.69 5.27