Outage Showing for:-

Sr.No. Outage ID Outage type Element Name Element Type Outage Mode Reason Request Details Status
From Date From Time To Date TO Time
1 49 PLANNED Kashang 220KV(HPPTCL)-Wangtoo 220 KV(HPPTCL) 2 LINE DAILY Annual testing of the Bay feeding Wangtoo Kashang TL 10-03-2022 09:00:29 10-03-2022 17:00:29 REJECTED
2 56 EMERGENCY Karcham wangtoo (400 Kv)(jsw)-Wangtoo (400 kV)(HPPTCL) 2 LINE DAILY Replacement of bottom stack of the LA installed at B Phase of the Karcham Wangtoo Ckt 1 10-03-2022 08:00:33 10-03-2022 17:00:33 REJECTED
3 82 D-3 Kashang 220KV(HPPTCL)-Wangtoo 220 KV(HPPTCL) LINE DAILY For repair of conductor and tightening of dead end clamp(Nuts and Bolts) between T-46 to T-47 of the line. 19-07-2022 12:55:12 19-07-2022 12:55:12 REJECTED
4 88 D-3 Kashang 220KV(HPPTCL)-BHOKTOO (220 Kv)(HPPTCL) 1 LINE DAILY For Oil Filteration and Dehydration of 220/66KV 31.5MVA transformer 26-09-2022 11:22:14 26-09-2022 11:22:14 REJECTED