Home  »   LTA/MTOA Information

LTA/MTOA Information

HP State Entities under Long Term Access

Sr.No. Name of the Customer/ State Entity Start date End date Name of Hydro Power Projects Point of Injection Point of Drawl Transmission system used Distribution System used Capacity for which OA is granted (MW)
1 Himachal Pradesh State Electricity Board Ltd. (DISCOM) 01.04.1989 Entire Life/As per Share allocation ANTA GPP CTU CTU connected Interstate drawal Points in HP Powergrid - 14.599184
01.12.1990 AURAIYA GPP Powergrid 21.417904
01.04.1982 BAIRASIUL HEP Powergrid 0.000000
01.05.1994 CHAMERA HEP Powergrid 15.472080
31.03.2004 CHAMERA-II HEP Powergrid 10.877880
30.06.2012 CHAMERA-III HEP Powergrid 0.000000
01.05.1992 DADRI GPP Powergrid 24.289528
31.12.2014 DADRI-II TPS Powergrid 1.662570
01.11.2005 DHAULIGANGA HEP Powergrid 9.876048
18.07.2015 Koldam HEP Powergrid 118.560000
01.07.1992 NAPP Powergrid 12.347940
18.05.2004 NATHPA JHAKRI HEP Powergrid 362.645400
30.03.2014 Parbati-III Powergrid 0.000000
04.02.2010 RAPP-C Powergrid 13.202200
24.04.2014 Rampur HEP Powergrid 117.685602
01.01.1990 RIHAND STPS Powergrid 33.764000
15.08.2006 RIHAND-II STPS Powergrid 32.625000
19.11.2012 RIHAND-III STPS Powergrid 33.478125
31.12.2014 SINGRAULI STPS Powergrid 3.157750
01.04.1995 SALAL HEP Powergrid 6.762690
07.11.2019 TANDA-II STPS Powergrid 1.741740
01.04.1993 TANAKPUR HEP Powergrid 3.573873
13.02.1992 UNCHAHAR-I TPS Powergrid 6.612060
01.03.2000 UNCHAHAR-II TPS Powergrid 11.592504
01.01.2007 UNCHAHAR-III TPS Powergrid 7.644000
30.09.2017 UNCHAHAR-IV TPS Powergrid 0.937500
01.06.1997 URI HEP Powergrid 12.851904
24.05.2003 Baspa- II Powergrid 300.000000
01.08.2008 Kahalgaon - II Powergrid 21.515625
31.12.2014 Singrauli Solar PV Powergrid 15.000000
06.06.2015 SECI Solar Powergrid 20.000000
1965 Dhakrani HEP Powergrid 8.440000
1965 Dhalipur HEP Powergrid 12.750000
1975 Chibroo HEP Powergrid 60.000000
1984 Khodri HEP Powergrid 30.000000
1976 Kulhal HEP Powergrid 6.000000
1992 Khara HEP Powergrid 14.400000
2000 Ranjit Sagar Dam (Thein Dam) Powergrid 27.600000
1966 Bhakra Complex BBMB 102.000000
1977 Dehar BBMB 54.000000
1978 Pong BBMB 11.000000
2 Government of Himachal Pradesh 01.04.1982 Entire Life/As per Share allocation BAIRASIUL HEP CTU CTU connected Interstate drawal Points in HP Powergrid - 21.448800
01.05.1994 CHAMERA HEP Powergrid 64.022400
31.03.2004 CHAMERA-II HEP Powergrid 35.568000
30.06.2012 CHAMERA-III HEP Powergrid 29.669640
18.07.2015 Koldam HEP Powergrid 102.752000
18.05.2004 NATHPA JHAKRI HEP Powergrid 177.840000
30.03.2014 Parbati-III Powergrid 66.788800
24.04.2014 Rampur HEP Powergrid 52.919849
3 Taranda Hydro Power Private Limited 12-25-19 06-29-39 2x6.5 MW Rala SHEP 66/220/400 KV Wangtoo Sub-station Tata Power DDL, Delhi / NR HPPTCL - 12.65 MW from 25.12.2019 to 30.09.2031
9.25 MW from 01.10.2031 to 29.06.2039
4 Suryakanta Hydro Energies Private Limited 10-01-18 05-22-37 2x7 MW Lower-Nanti SHEP 66 KV Ghanvi Stage-II Tata Power DDL, Delhi / NR HPPTCL HBSEBL 12.00 MW from 01.10.2018 to 13.05.2026
11.16 MW from 14.05.2026 to 22.05.2037
5 Nanti Hydro Power Private Limited 09-01-19 10-31-37 2x6.75 MW Upper-Nanti SHEP 66 KV Ghanvi Stage-II Tata Power DDL, Delhi / NR HPPTCL HBSEBL 11.50 MW from 01.09.2019 to 26.10.2029
10.69 MW from 27.09.2029 to 31.10.2037
6 Everest Power Pvt. Ltd. 07-12-12 07-11-52 2x50 MW Malana-II HEP 220 KV DC Transmission line from Chhaur Substation to PGCIL Banala Pooling Point) ISTS connection points for drawee utility at punjab Existing ISTS system beyond parbati Pooling Point - 86 MW