Home » LTA/MTOA Information
LTA/MTOA Information
HP State Entities under Long Term Access
Sr.No. | Name of the Customer/ State Entity | Start date | End date | Name of Hydro Power Projects | Point of Injection | Point of Drawl | Transmission system used | Distribution System used | Capacity for which OA is granted (MW) |
---|---|---|---|---|---|---|---|---|---|
1 | Himachal Pradesh State Electricity Board Ltd. (DISCOM) | 01.04.1989 | Entire Life/As per Share allocation | ANTA GPP | CTU | CTU connected Interstate drawal Points in HP | Powergrid | - | 14.599184 |
01.12.1990 | AURAIYA GPP | Powergrid | 21.417904 | ||||||
01.04.1982 | BAIRASIUL HEP | Powergrid | 0.000000 | ||||||
01.05.1994 | CHAMERA HEP | Powergrid | 15.472080 | ||||||
31.03.2004 | CHAMERA-II HEP | Powergrid | 10.877880 | ||||||
30.06.2012 | CHAMERA-III HEP | Powergrid | 0.000000 | ||||||
01.05.1992 | DADRI GPP | Powergrid | 24.289528 | ||||||
31.12.2014 | DADRI-II TPS | Powergrid | 1.662570 | ||||||
01.11.2005 | DHAULIGANGA HEP | Powergrid | 9.876048 | ||||||
18.07.2015 | Koldam HEP | Powergrid | 118.560000 | ||||||
01.07.1992 | NAPP | Powergrid | 12.347940 | ||||||
18.05.2004 | NATHPA JHAKRI HEP | Powergrid | 362.645400 | ||||||
30.03.2014 | Parbati-III | Powergrid | 0.000000 | ||||||
04.02.2010 | RAPP-C | Powergrid | 13.202200 | ||||||
24.04.2014 | Rampur HEP | Powergrid | 117.685602 | ||||||
01.01.1990 | RIHAND STPS | Powergrid | 33.764000 | ||||||
15.08.2006 | RIHAND-II STPS | Powergrid | 32.625000 | ||||||
19.11.2012 | RIHAND-III STPS | Powergrid | 33.478125 | ||||||
31.12.2014 | SINGRAULI STPS | Powergrid | 3.157750 | ||||||
01.04.1995 | SALAL HEP | Powergrid | 6.762690 | ||||||
07.11.2019 | TANDA-II STPS | Powergrid | 1.741740 | ||||||
01.04.1993 | TANAKPUR HEP | Powergrid | 3.573873 | ||||||
13.02.1992 | UNCHAHAR-I TPS | Powergrid | 6.612060 | ||||||
01.03.2000 | UNCHAHAR-II TPS | Powergrid | 11.592504 | ||||||
01.01.2007 | UNCHAHAR-III TPS | Powergrid | 7.644000 | ||||||
30.09.2017 | UNCHAHAR-IV TPS | Powergrid | 0.937500 | ||||||
01.06.1997 | URI HEP | Powergrid | 12.851904 | ||||||
24.05.2003 | Baspa- II | Powergrid | 300.000000 | ||||||
01.08.2008 | Kahalgaon - II | Powergrid | 21.515625 | ||||||
31.12.2014 | Singrauli Solar PV | Powergrid | 15.000000 | ||||||
06.06.2015 | SECI Solar | Powergrid | 20.000000 | ||||||
1965 | Dhakrani HEP | Powergrid | 8.440000 | ||||||
1965 | Dhalipur HEP | Powergrid | 12.750000 | ||||||
1975 | Chibroo HEP | Powergrid | 60.000000 | ||||||
1984 | Khodri HEP | Powergrid | 30.000000 | ||||||
1976 | Kulhal HEP | Powergrid | 6.000000 | ||||||
1992 | Khara HEP | Powergrid | 14.400000 | ||||||
2000 | Ranjit Sagar Dam (Thein Dam) | Powergrid | 27.600000 | ||||||
1966 | Bhakra Complex | BBMB | 102.000000 | ||||||
1977 | Dehar | BBMB | 54.000000 | ||||||
1978 | Pong | BBMB | 11.000000 | ||||||
2 | Government of Himachal Pradesh | 01.04.1982 | Entire Life/As per Share allocation | BAIRASIUL HEP | CTU | CTU connected Interstate drawal Points in HP | Powergrid | - | 21.448800 |
01.05.1994 | CHAMERA HEP | Powergrid | 64.022400 | ||||||
31.03.2004 | CHAMERA-II HEP | Powergrid | 35.568000 | ||||||
30.06.2012 | CHAMERA-III HEP | Powergrid | 29.669640 | ||||||
18.07.2015 | Koldam HEP | Powergrid | 102.752000 | ||||||
18.05.2004 | NATHPA JHAKRI HEP | Powergrid | 177.840000 | ||||||
30.03.2014 | Parbati-III | Powergrid | 66.788800 | ||||||
24.04.2014 | Rampur HEP | Powergrid | 52.919849 | ||||||
3 | Taranda Hydro Power Private Limited | 12-25-19 | 06-29-39 | 2x6.5 MW Rala SHEP | 66/220/400 KV Wangtoo Sub-station | Tata Power DDL, Delhi / NR | HPPTCL | - | 12.65 MW from 25.12.2019 to 30.09.2031 |
9.25 MW from 01.10.2031 to 29.06.2039 | |||||||||
4 | Suryakanta Hydro Energies Private Limited | 10-01-18 | 05-22-37 | 2x7 MW Lower-Nanti SHEP | 66 KV Ghanvi Stage-II | Tata Power DDL, Delhi / NR | HPPTCL | HBSEBL | 12.00 MW from 01.10.2018 to 13.05.2026 |
11.16 MW from 14.05.2026 to 22.05.2037 | |||||||||
5 | Nanti Hydro Power Private Limited | 09-01-19 | 10-31-37 | 2x6.75 MW Upper-Nanti SHEP | 66 KV Ghanvi Stage-II | Tata Power DDL, Delhi / NR | HPPTCL | HBSEBL | 11.50 MW from 01.09.2019 to 26.10.2029 |
10.69 MW from 27.09.2029 to 31.10.2037 | |||||||||
6 | Everest Power Pvt. Ltd. | 07-12-12 | 07-11-52 | 2x50 MW Malana-II HEP | 220 KV DC Transmission line from Chhaur Substation to PGCIL Banala Pooling Point) | ISTS connection points for drawee utility at punjab | Existing ISTS system beyond parbati Pooling Point | - | 86 MW |