Power Supply Position Report For NRLDC

Month/Day 27-04-2024 PEAK DEMAND(MW)
Min.DEMAND(MW)

HRS.OF THE DAY GENERATION (MW) NET IMPORT(MW) DEMAND MET(MW) FREQ-UENCY CORREC-TION(MW) Low Availability(in MW) Financial Constraints (in MW) Emergency load shedding due to security and reliability of the Grid-over Drawl(in MW) Planned maintenance in transmission system(in MW) Transmission constraint(in MW) Planned maintenance in distribution system (in MW) Distribution constraints (in MW) Any other reasion( to be specfied) (MW) TOTAL DEMAND NOT MET (MW) TOTAL ENERGY EQUIVA-LENT TO DEMAND NOT MET (MU) TOTAL UNRESTRI-CTED DEMAND (MW)P7=P1+P2+P11
OWN GEN Malana BASPA MALANA-II SAWRA KUDDU BAJOLI HOLI TOTAL
P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P11/1000 P12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Total (in MWH) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Hourly Average Frequency (Fr) HZ
Demand met for the day MW
Unrestricted Demand for the day MW
Minimum Demand(Unrestricted) for the day MW Aux. Net gen.
Gross own generation MWH
Gross Baspa generation MWH
Gross Malana generation MWH
Malana generation at 0300 Hrs. MW
Malana generation at 2400 Hrs. MW
Max.generation of Malana at 2100 Hrs. MW
Off Peak Hrs MW Peak Hrs MW Gross Lus Net Lus
Total Own Generation
Above 25 MW
Below 25 MW(Small Hydro<25 MW)