1 |
Performance Audit & Communication System |
01-01-1970 |
--
|
2 |
Communication Plant Availability of HP Stations |
01-01-1970 |
--
|
3 |
Energy Schedule of The Himachal Pradesh |
01-01-1970 |
--
|
4 |
Open Access (Intra & Inter) Generation report |
01-01-1970 |
--
|
5 |
The records of the Deviation Accounts on weekly basis |
01-01-1970 |
--
|
6 |
List of application where approval for connectivity granted by HPSLDC . |
01-01-1970 |
--
|
7 |
Transmission / distribution charges and applicable transmission losses. |
01-01-1970 |
--
|
8 |
Separate lists for long-term access and medium-term open access |
01-01-1970 |
--
|
9 |
List of application, separately for long-term access and medium-term open Access, received by the nodal agency along with necessary details. |
01-01-1970 |
--
|
10 |
The Himachal Pradesh Electricity Commission (Short-Term Open Access) Regulations-2010 |
01-01-1970 |
--
|
11 |
Transmission constraints |
01-01-1970 |
--
|
12 |
Major Generation and Transmission outages |
01-01-1970 |
--
|
13 |
Voltage profile: The voltage profile of 66 kV and above Substations |
01-01-1970 |
--
|
14 |
Frequency profile: Maximum and minimum frequency recorded daily on 15 minutes time block basis and also average frequency during peak, off-peak and normal period; |
01-01-1970 |
--
|
15 |
URS Procedure |
01-01-1970 |
--
|
16 |
Monthly Energy Accounting |
01-01-1970 |
--
|
17 |
Detail on late payment surcharge/interest |
01-01-1970 |
--
|
18 |
Deviation Pool Status (Monthly / Weekly / Half- Yearly/ Annually) |
01-01-1970 |
--
|
19 |
Monthly Grid Distribution report |
01-01-1970 |
--
|
20 |
Merit Order Dispatch and interest on late payment |
01-01-1970 |
--
|
21 |
Line availability |
01-01-1970 |
--
|
22 |
Telemetry report on a detail basis |
01-01-1970 |
--
|
23 |
Available Transmission capability (ATC)/ Total Transmission capability (TTC) |
01-01-1970 |
--
|
24 |
Transmission / Wheeling charges and applicable transmission / distribution losses (Weekly, monthly, Annual) |
01-01-1970 |
--
|
25 |
Detailed procedure for integration of power system elements (Grid Code provisions) |
01-01-1970 |
--
|
26 |
Operating Procedure |
01-01-1970 |
--
|
27 |
List of important Grid elements |
01-01-1970 |
--
|