Skip to Main Section

A+ A A-
  • About Us
    • Organization Chart
    • Function
    • Constitution Of SLDC’s
    • Compliance Of Directions
    • Committee Members
    • Duty Roaster
    • Himachal Pradesh Power Sector Reforms
    • Tripartite Agreement
    • Formation of SLDC under HP State Load Desptach Society
    • Memorandum of Association of HPLDS
    • HPSLDC Declared as Independent Entity
    • HPSLDC Declared as Independent Authority and new General Body
    • Creation of the MD’s Post
  • Tenders
    • HP Govt. eProcurement System
    • NIT/NIQ
  • Contact Us
Login
  • Home
  • Scheduling
    • Check Schedule
    • Intra State Power Transaction
    • Net Schedule (At state Periphery)
    • Entitlement Schedule
  • Open Access
    • Open Access Entities
      • Open Access Registered Entities
      • Others Registered Entities
      • Solar Projects
    • Apply For Application
    • Pre Registration
    • STOA Applications
      • Inter-Approved Application
      • Intra-Approved Application
      • Collective-Approved Application
      • NOC Summary
    • LTA/MTOA Information
  • Commercials
    • State Deviation Settlement Account
      • New Bill (7 July 2019)
      • Old Bill (3 Dec 2018 to 6 July 2019)
    • Reactive Energy Charges
    • SLDC Charges LTOA Charges
    • STU And Wheeling Charges
    • Cross Subsidy Charges
    • URS Booking
    • Energy Injection Report
    • Surcharge
      • LTOA Charges
      • State Deviation Settlement Account
  • Reports
    • Daily Reports – A
      • Scheduling
        • DR 1.6 – Schedule By NRLDC
        • DR 2.0.1 – Schedule By HPSLDC
        • HPSLDC Day Ahead Report
      • System Operation
        • DR 1.1 : CEA-Estimated vs Actual Generation.
        • DR 1.2 : NRPC-Hourly Demand Met.
        • DR 1.3 : NRLDC-Demand Met & Power Supply Position
        • DR 1.5: Merit Order Portal Report
      • DR-DAD-1: Day Ahead Disposal Report
      • DR-DAD-2: Day Ahead Report
      • DR-DAD-3: Actual Vs Anticipated Report
      • DR-DAD-4: Daily Generation State Power Houses
      • DR-DAD-5: HPSLDC-Daily Power Supply
      • DR-DAD-7: Anticipated Vs Actual Generations
      • DR-DAD-8: Day Ahead Vs Actual Schedule
      • DR 2.0.1: DA HPSLDC
      • DR2.3 Demand met India vs HP
      • DR2.5.0 Industrial load HP
      • DR 2.11: Daily GoHP Power
      • IEX Schedule
        • Schedule
        • Obligation Report
    • Daily Reports – B
      • DR2.0.2 GRAPHS
      • DR 2.14: Entitlements
      • RTU & Communication Status
      • Anticipated Vs Actual Generation
      • Un-planned Shut Down Report
      • Rejected Shut Down Report
      • Real time HP Data Report
      • Load Shedding Report
      • Actual Real Time Data Report
      • Power Transaction Analysis Report
      • Tripping Report Summary
      • Tripping Report
      • GoHP Power Share Scheduling Report
      • Frequency Report
      • Power Cut Report
      • Daily Hourly Demand Report
      • Zero Schedule Report
      • Partial Zero Schedule
      • Surrendered
      • Center Sector After Surrender
      • IMP Schedule Report
      • Entitlement Report
      • Telemetry Report
      • Demand Met of Himachal Pradesh
      • Himachal Pradesh Actual Generation(HPSLDC)
      • Himachal Pradesh Generation(Total)
      • HP Schedule,Drawl, OD/UD & DSA Rate
      • Day ahead Vs Actual Report
      • HPSEBL & GoHP Schedule , Drawl , OD/UD & Frequency Report
      • Demand Met India Vs HP
      • Actual Energy Generation of Himachal Pradesh
      • Daily supply cea
      • Daily Sale Purchase
      • STU & Wheeling Monthly
      • Power Supply Position Report For NRPC
      • Power Supply Position Report For NRLDC
      • Actual Generation Report
    • Daily Commercial
      • DCR 4.1: Exchange (IEX / PXIL/ RTM) Energy Daily Report
      • DCR 4.2: IEX (NLDC-POSOCO) Charges Daily Report
      • DCR 4.3: NRLDC – Charges Report
      • DCR 4.4: SLDC – Bilateral Intra State Charges Report
      • DCR 4.5: DSM Charges Paid / Receipt by HPSLDC – Weekly Report
      • DCR 4.6 Wheeling & STU Charges Report
      • DCR 4.7: URS / RTM Purchase / Booking
    • Daily Summery
      • DS3.5: Energy Requirement Vs Energy Availability (Actual)
      • DS3.4: Forecasted Vs Actual Demand Summary
      • DS3.7: Frequency based Drawl
      • DS3.2: OD/ UD Summary
      • DS3.1: Power Supply Summary
      • DS3.6: Summary DPS – Real Time
      • DS3.3: Summary Generations of P/H under Discom / IPPs/ GoHP Shares / Entitlements
      • DS3.8: Tripping Report Summary
    • Weekly Reports
      • WR1.1: Deviation Settlement Charges Account
      • WR1.2: Reactive Energy Charges Account
      • WR1.3: Wheeling & STU Charges Account
      • Reactive Energy Report
      • Voltage Profile Report
      • Short-term open access information
    • Monthly Reports – A
      • MSR 2.3 Energy Injection Reports (EIRs)
      • MSR 2.6 Merit Order Portal
      • MSR 2.7: Cross-subsidy & Addl. Surcharge Bill
      • Open Access
        • NOC
      • Shunt Capacitor Report
      • Installed Capacity(MW) And Generation(MU) From Renewable Report
      • Power Station Report
      • SEA DSM Report
      • DGA Report
      • Revised Provisional Power Report
      • Power Availability & Requirement
      • TTC/ATC Report
      • Transmission System Availability Factor
    • Monthly Reports – B
      • MR 1.1 Monthly Notified Power Cuts
      • MR 1.2 Generation Power Houses in HP
      • MR 1.3 CEA-Provisional Power Supply Position (Format-28)
      • MR 1.4: Final Power Supply Position (Format-29)
      • MR 1.6 Report of Captive Power Injection In The Grid
      • Monthly Generation & Installed Capacity Of Renewable Energy Resources
      • MR1.8 Information on Inter State Share Of RE Consumer
      • MR 1.9 Summery Report Of UFR Operation
      • MR 1.10 Free Energy Consumption Of OA – Generators
      • MR1.11 Energy Purchased /Consumed by OA
      • MR1.18 Tripping Report
      • MR1.19 Power Transaction on Analysis
      • MR1.20 Frequency Pattern
      • MR1.21 Generation on & Availability – Monthly & Yearly
      • MR1.22 GoHP Energy Account-UI, Shares, Actual Implemented
      • MR1.23 Implemented OD/ UD of Discom as per DSA
      • MR1.24 NR Final Renewal Energy Account
    • Quarterly Reports
      • QR1.1 Deviation UI Pool Account
      • QR1.3 Load Generation Balance Report (LGBR)
    • Half Yearly Reports
      • HYR-SPSDF-1 DSM Account to HPERC
      • LGBR (Load Generation Balance Report)
    • Post-Dispatch Analysis Report
      • Monthly Reports
        • PDR 1.1 Tripping Analysis
        • PDR 1.2 SoPR (Standard of Performance and Regulation) Data FOR ISTS Licensee
        • PDR1.3 Frequent Single element tripping in a month
        • PDR 1.4 Multiple Element Tripping in a Month
        • PDR 1.5 Inter Regional Tripping in a month
        • PDR 1.6 FRC Computation and analysis
        • PDR 1.7 Load Crash Analysis
        • PDR 1.8 Reactive Power Management in its control area
        • PDR 1.11 UFR and df/dt operation
        • PDR 1.12 ADMS related updates
        • PDR 1.13 Analysis of sudden frequency excursions
        • PDR 1.14 SPS Operation and feedback
      • Quartely Reports
        • PDR 1.9 LVRT/FRT issues or other protection related issues for renewable genrators
        • PDR 1.10 Protection Database formation and updation
    • Yearly Reports
      • DAD- 1: Day Ahead
      • DAD- 2: Day Ahead Disposal
      • DAD- 3: Actual Vs Anticipated
      • DAD- 5: Daily Power Supply
      • DAD- 6: IEX Report
      • DAD- 7: Anticipated Vs Actual Genration
      • Daily / Weekly / Monthly / Yearly Generation Of State Power Houses
      • Availability & Demand of Himachal Pradesh
      • Details of Power Purchase & Sale outside the State
      • FY Audit Report of HPSLDC
      • HPSLDC-Trainings
      • HP State Power Houses Actual Generation
  • Acts & Regulations
    • Regulations
      • HPERC Regulations
      • CEA Regulations
      • CERC Regulations
    • Electricity Act 2003
    • Procedure
    • Cabil Report
    • Samast Report
    • SLDC MYTs
      • MYT Petitions / MTR
      • MYT Orders
    • State PSDF
  • Meetings
    • OCC Meetings
    • State Level OCC Meeting
    • TEST Sub Meetings
    • State Level TEST Sub Meeting
    • TCC meeting
    • State Level TCC Meeting
    • System Study Group Meeting
    • General Body Meeting of HP
  • Map
    • Power Map of HP
    • Grid Diagram of HP (66kv & Above)
    • Hydel Power Potential Map of HP
      • New
      • 2010
    • Single Line Diagram of HP
      • 66kV and Above
      • 33kV / 22 kV
  • Weather
  • Archive
    • Frequency
    • Frequency Vs OD(+)/UD(-)
    • Demand Met
    • DSM Rates
    • IEX RTM Rate
    • IEX DAM Rate
    • Daily Power Supply
    • Day Ahead Anticipated

Raigarh (chattisgarh)_15.03.22_Event

Posted byData Manager 2022-04-18

About Us

SLDC in the State of Himachal Pradesh was established in the year 2002 and since then Himachal Pradesh State Electricity Board Ltd. (erstwhile HPSEB) was taking care of various SLDC functions uptill its reorganization under reforms scheme, 2010.

The site is best viewd in

Hit Count : 3 2 5 1 9 9

Quick Links

  • Privacy Policy
  • Terms And Condition
  • Sitemap
  • Disclaimer
  • Official Language Policy

Contact Us

Himachal Pradesh State Load Despatch Centre

(An apex Body)

Govt. of Himachal Pradesh Totu, Shimla -171011

+01772838666

sehpsldc[at]hpmail[dot]in

2019 © HPSLDC. All Rights Reserved & Content Owned, Updated and Maintained by HPSLDC