Site Map
- Home
- Scheduling
- Open Access
- Commercials
- Reports
- Daily Reports – A
- Scheduling
- System Operation
- DR-DAD-1: Day Ahead Disposal Report
- DR-DAD-2: Day Ahead Report
- DR-DAD-3: Actual Vs Anticipated Report
- DR-DAD-4: Daily Generation State Power Houses
- DR-DAD-5: HPSLDC-Daily Power Supply
- DR-DAD-7: Anticipated Vs Actual Generations
- DR-DAD-8: Day Ahead Vs Actual Schedule
- DR 2.0.1: DA HPSLDC
- DR2.3 Demand met India vs HP
- DR2.5.0 Industrial load HP
- DR 2.11: Daily GoHP Power
- IEX Schedule
- Daily Reports – B
- DR2.0.2 GRAPHS
- DR 2.14: Entitlements
- RTU & Communication Status
- Anticipated Vs Actual Generation
- Un-planned Shut Down Report
- Rejected Shut Down Report
- Real time HP Data Report
- Load Shedding Report
- Actual Real Time Data Report
- Power Transaction Analysis Report
- Tripping Report Summary
- Tripping Report
- GoHP Power Share Scheduling Report
- Frequency Report
- Power Cut Report
- Daily Hourly Demand Report
- Zero Schedule Report
- Partial Zero Schedule
- Surrendered
- Center Sector After Surrender
- IMP Schedule Report
- Entitlement Report
- Telemetry Report
- Demand Met of Himachal Pradesh
- Himachal Pradesh Actual Generation(HPSLDC)
- Himachal Pradesh Generation(Total)
- HP Schedule,Drawl, OD/UD & DSA Rate
- Day ahead Vs Actual Report
- HPSEBL & GoHP Schedule , Drawl , OD/UD & Frequency Report
- Demand Met India Vs HP
- Actual Energy Generation of Himachal Pradesh
- Daily supply cea
- Daily Sale Purchase
- STU & Wheeling Monthly
- Power Supply Position Report For NRPC
- Power Supply Position Report For NRLDC
- Actual Generation Report
- Daily Commercial
- DCR 4.1: Exchange (IEX / PXIL/ RTM) Energy Daily Report
- DCR 4.2: IEX (NLDC-POSOCO) Charges Daily Report
- DCR 4.3: NRLDC – Charges Report
- DCR 4.4: SLDC – Bilateral Intra State Charges Report
- DCR 4.5: DSM Charges Paid / Receipt by HPSLDC – Weekly Report
- DCR 4.6 Wheeling & STU Charges Report
- DCR 4.7: URS / RTM Purchase / Booking
- Daily Summery
- DS3.5: Energy Requirement Vs Energy Availability (Actual)
- DS3.4: Forecasted Vs Actual Demand Summary
- DS3.7: Frequency based Drawl
- DS3.2: OD/ UD Summary
- DS3.1: Power Supply Summary
- DS3.6: Summary DPS – Real Time
- DS3.3: Summary Generations of P/H under Discom / IPPs/ GoHP Shares / Entitlements
- DS3.8: Tripping Report Summary
- Weekly Reports
- Monthly Reports – A
- MSR 2.3 Energy Injection Reports (EIRs)
- MSR 2.6 Merit Order Portal
- MSR 2.7: Cross-subsidy & Addl. Surcharge Bill
- Open Access
- Shunt Capacitor Report
- Installed Capacity(MW) And Generation(MU) From Renewable Report
- Power Station Report
- SEA DSM Report
- DGA Report
- Revised Provisional Power Report
- Power Availability & Requirement
- TTC/ATC Report
- Transmission System Availability Factor
- Communication Plant Availability of HP Stations
- Monthly Reports – B
- MR 1.1 Monthly Notified Power Cuts
- MR 1.2 Generation Power Houses in HP
- MR 1.3 CEA-Provisional Power Supply Position (Format-28)
- MR 1.4: Final Power Supply Position (Format-29)
- MR 1.6 Report of Captive Power Injection In The Grid
- Monthly Generation & Installed Capacity Of Renewable Energy Resources
- MR1.8 Information on Inter State Share Of RE Consumer
- MR 1.9 Summery Report Of UFR Operation
- MR 1.10 Free Energy Consumption Of OA – Generators
- MR1.11 Energy Purchased /Consumed by OA
- MR1.18 Tripping Report
- MR1.19 Power Transaction on Analysis
- Transmission Constraint
- Major Generation and Transmission outages
- MR1.22 GoHP Energy Account-UI, Shares, Actual Implemented
- MR1.23 Implemented OD/ UD of Discom as per DSA
- MR1.24 NR Final Renewal Energy Account
- Quarterly Reports
- Half Yearly Reports
- Post-Dispatch Analysis Report
- Monthly Reports
- PDR 1.1 Tripping Analysis
- PDR 1.2 SoPR (Standard of Performance and Regulation) Data FOR ISTS Licensee
- PDR1.3 Frequent Single element tripping in a month
- PDR 1.4 Multiple Element Tripping in a Month
- PDR 1.5 Inter Regional Tripping in a month
- PDR 1.6 FRC Computation and analysis
- PDR 1.7 Load Crash Analysis
- PDR 1.8 Reactive Power Management in its control area
- PDR 1.11 UFR and df/dt operation
- PDR 1.12 ADMS related updates
- PDR 1.13 Analysis of sudden frequency excursions
- PDR 1.14 SPS Operation and feedback
- Quartely Reports
- Monthly Reports
- Yearly Reports
- DAD- 1: Day Ahead
- DAD- 2: Day Ahead Disposal
- DAD- 3: Actual Vs Anticipated
- DAD- 5: Daily Power Supply
- DAD- 6: IEX Report
- DAD- 7: Anticipated Vs Actual Genration
- Daily / Weekly / Monthly / Yearly Generation Of State Power Houses
- Availability & Demand of Himachal Pradesh
- Details of Power Purchase & Sale outside the State
- FY Audit Report of HPSLDC
- HPSLDC-Trainings
- HP State Power Houses Actual Generation
- List of Substations and Transmission Lines connected to the Intra-State Transmission network
- Performance audit & Communication System
- Daily Reports – A
- Acts & Regulations
- Meetings
- Map
- Weather
- Archive
- Regulatory Compliance
- About Us
- Organization Chart
- Function
- Constitution Of SLDC’s
- Compliance Of Directions
- Committee Members
- Duty Roaster
- Himachal Pradesh Power Sector Reforms
- Tripartite Agreement
- Formation of SLDC under HP State Load Desptach Society
- Memorandum of Association of HPLDS
- HPSLDC Declared as Independent Entity
- HPSLDC Declared as Independent Authority and new General Body
- Creation of the MD’s Post
- Tenders
- Contact Us