Latest News

Disclosure Of Multi Year Tariff Petition As Filed By Hplds Before The Himachal Pradesh Electricity Regulatory Commission For The 4th Control Period I.e. From 2019-20 To 2023-24

The main responsibilities of HPSLDC are :

To ensure integrated operation of the power system. | To give directions and exercise supervision and control which is required for integrated operation to achieve maximum economy and efficiency in power system operation. | Scheduling and Re-Scheduling of available resources for optimum and economic operation of the power system. | To coordinate shutdowns for the Generating Units and Sub-station equipment, including transmission lines taking into consideration Continuity of Supply. | System Restoration in a systematic manner in the shortest possible duration, following Grid Disturbances. | Accounting of Energy handled by the State System. | Compiling & Furnishing data pertaining to Power System Operation. | System Operation, ABT Scheduling & Energy Accounting. | SCADA System Operation & Maintenance.

Himachal Pradesh Drawl

Substations of H.P

Lahaul & SpitiChambaKangraKulluMandiUnaHamirpurBilaspurKinnaurShimlaSolanSirmaur

Power Supply Position of HP

96

Max O/D

-12512

Drawl (MW)

-12512

Deviation (MW)

0

Max U/D

Min

00:00 AM

Max

00:00 AM

Min / Max Demand Met (MW)

Latest News & Updates

05

Apr

Test

05

Apr

MRI data of interface meters...

05

Apr

Telephone Nos. of New SLDC ...

05

Apr

All Solar/Co-gens/RE Generators are advised to fill...

05

Apr

All Solar/Co-gens/RE Generators...

More Updates

Himachal Pradesh State Load Despatch Centre (HPSLDC) Powerful, Effective, Efficient with Independent Governance and High Ethical Standards driven by Altruistic values.

Our vision is to become the most recognized and coveted expert institution amongst all Indian states while catering to the requirements of all stakeholders across electricity value chain of the HP power sector in transparent, efficient, economical and equitable manner.

Site Viewer: 12509